Substation Automation Lab
- Circuit Breaker Status Indication from field input
- Control of Group Operated Switches (GOS) from workstation
- Monitoring Feeder parameter from workstation
- Fault scenario simulation in a feeder
- Fault scenario simulation in a Transformer /Bus
- Load Transfer from one Feeder to other during Transformer Maintenance
- Control Of Bus Voltages Through Onload Tap Changes
- Development of 11KV/433 volts substation automation scheme using PLC for normal load operation
- Development of 11KV/433 volts substation automation scheme using PLC for timer ON/OFF load control
- Development of 11KV/433 volts substation automation scheme using PLC for cyclic ON/OFF load control
- Autoreclosure And Sectionalizer Operation